Becker Arena Products Inc. project profile

Becker Arena Products manufactured and installed the BAP 6.0 steel framed dasher system with player, penalty, and timekeeper areas in September ofThe Connery Ice Arena is one of 23 rinks managed by FMC Ice Sports. It was in need updating, and FMC reached out to Becker Arena Products for the job. Watch the virtual tour here.

We provided one BAP6.0 Signature Series steel dasher frame system with player and penalty boxes, “Vision” supportless tempered glass shielding, and permanent backer panels.

The existing boards were taken in on trade through our used division, Rink Equipment Resource.

The installation of the boards at the Connery Rink went very smooth. A large contributor to a successful installation was the organization and thoroughness from Becker Arena Products. Thank you for everything!

Kyle CorreiraDirector of Maintenance & Operations, FMC Ice Sports

Location

Lynn, Massachusetts

Client

Public

Project Type

Renovation

Type of Venue

Community Arena